This project involved the supply and commissioning of a high-capacity power generation unit for a major industrial client located in Port Klang, Selangor. The deployment showcases Lux Electrical Enterprise expertise in load analysis and custom engineering rather than just standard equipment supply.
Consultative Approach & Load Analysis
The success of this project was rooted in our technical advisory phase:
Initial Request: The client originally requested a lower-capacity generator based on their own estimates.
Technical Intervention: Our engineering team conducted a comprehensive Actual Load Calculation to determine the peak starting currents and long-term operational requirements of the facility.
The Recommendation: We identified that a lower-capacity unit would suffer from frequent tripping and premature engine wear. We proposed a customized 450kVA solution that balanced operational safety with future scalability.
Technical Specifications & Deliverables
The final system delivered was a robust, custom-built power plant designed for heavy-industrial endurance:
Capacity: 450kVA Prime Power.
Engine: Cummins Engine (renowned for reliability, high torque, and global parts availability).
Alternator: EVOTECH, specifically selected for its superior voltage regulation and thermal efficiency.
Enclosure Type: Soundproof Canopy, designed to withstand the corrosive coastal environment of Port Klang while significantly reducing noise pollution.
Custom Features: Tailored control panel settings to match the specific load profile of the client’s machinery.
Key Outcomes
Precision Specs: The client received a system perfectly matched to their load, ensuring 100% uptime during power outages.
Long-term Savings: By investing in the correct capacity from the start, the client avoided the cost of upgrading an undersized unit within 12 months.
Successful Commissioning: The unit was successfully delivered, positioned, and tested at the Port Klang site, meeting all safety and performance benchmarks.